What approval procedures are required for the installation of small wind turbines?

With the dream of green energy, I plan to install a small wind turbine in my own courtyard or farm, which can not only contribute to environmental protection, but also save electricity costs and even create revenue. However, before 'riding the wind', a crucial step is to understand and complete the legal approval procedures. This is a systematic work involving multiple departments. Planning and consulting in advance can make your project more efficient and avoid the dilemma of being dismantled due to violations in the future.

This article will systematically review the main approval processes and precautions required for installing small wind turbines in China.

1、 Core principle: The nature of the project determines the approval path

Firstly, you must clarify the fundamental nature of the project: is your system for off grid use or is it intended for grid sales? The approval complexity of these two paths is vastly different.

Off Grid System: The electrical energy generated by the generator is stored only in the battery for its own use, without any physical connection to the national power grid. The approval process is relatively simple, mainly focusing on planning and security.

Grid Tied system: The generator is connected to the national power grid, and the electricity generated can be used for its own purposes, with the excess sold to the grid. The approval process is the most complex, requiring interaction with both the planning department and the power grid company.

2、 Step by Step Analysis: Main Approval Departments and Processes

1. Pre consultation and site evaluation (the most crucial first step)

Before purchasing any equipment, please make sure to follow these steps:

Consulting the local street office, township government, or village committee: This is the most direct and effective way. They are most familiar with the specific planning and management regulations of the local area, as well as whether there are any special restrictions (such as belonging to scenic areas, prohibited construction areas, etc.). Even if you have land use rights, you may not necessarily have airspace use rights to install high-altitude equipment.

Consult with the local Natural Resources and Planning Bureau (formerly the Planning Bureau and Land Bureau) to determine if your installation location complies with urban and rural planning and land use planning. Your property certificate or land certificate is an important basis.

Self assessment: Is your installation location far from your neighbor's house? Will tower height affect flight routes or communication signals? Excessive noise and visual impact may lead to neighborhood disputes, and early communication is crucial.

2. Grid connection application (applicable only to grid connected systems)

If you plan to connect to the grid, this is the first process that needs to be initiated.

Applicant: Local power supply bureau (business hall under State Grid Corporation of China or Southern Power Grid Corporation).

Required materials: usually include identification documents, property or land ownership certificates, grid connection application forms, model and technical parameter information of wind turbines and inverters and other equipment.

Process: The power supply company will accept your application and evaluate the connection conditions of the power grid. If agreed, both parties will sign the "Grid Connection Agreement" and the "Electricity Purchase and Sale Contract". This is a prerequisite for you to legally sell electricity in the future. Do not connect to the power grid without consent, as this is an illegal act and carries significant security risks.

3. Construction project planning permit

This is the core process of approval, whether off grid or grid connected, as long as it involves the construction of structures (especially taller towers), this permit may be required.

Approval department: Local Natural Resources and Planning Bureau at the city and county levels.

Required materials: application form, project approval documents (if needed), land use ownership certificate, construction project design plan (including models, heights, foundation design drawings, location drawings, etc. of wind turbines and towers), relevant opinions on influencing neighbors, etc.

Difficulty: Small wind turbine towers may be considered as "structures". Many regional planning regulations have strict provisions for new structures, especially facilities that may affect urban aesthetics, neighborhood lighting, and safety. For rural areas, policies may be relatively lenient, but it is necessary to report and obtain verbal or written permission.

4. Other possible approvals involved

Environmental Impact Assessment (EIA): For individual small-scale wind turbine projects, complex EIA filing is usually not required. But if the project is located in an ecologically sensitive area or may have a significant impact on the surrounding ecological environment, it is necessary to consult the environmental protection department.

Air obstacle approval: If your tower height is very high, you may need to report to the airspace or civil aviation management department to ensure that it does not pose a threat to aviation safety. But for general household towers of around 10-20 meters, this step is usually not required.

Cultural relic protection/scenic area management: If the installation site is located in special areas such as historical and cultural protection areas, scenic areas, etc., approval from the corresponding management department is also required.

3、 Important Suggestions and Summary

Consultation comes first, do not act blindly: the biggest risk is' cutting before reporting '. Before investing funds to purchase equipment, it is important to bring a preliminary plan and personally visit the township, street, and planning department for consultation to understand whether it is feasible and what materials are needed. This is the most cost-effective and effortless method.

Complete documents and standardized application: It is very important to prepare a set of standardized and professional application materials, including technical parameters of the equipment, installation drawings, safety certificates, etc. This can reflect your professionalism and increase the success rate of approval.

Neighborhood harmony, early communication: proactively communicate with surrounding neighbors before installation, explain the project situation, and eliminate their doubts about noise, safety, and visual impact. Obtaining their understanding and support can avoid endless complaints and disputes in the later stages of the project.

Professional installation, ensuring safety: Choose a qualified installation team to ensure that the tower foundation is firm and wind and lightning protection measures are in place. Safety is the bottom line that both the approval department and yourself should pay the most attention to.

In short, the approval procedures for installing small wind turbines are a process tailored to local conditions, and there is no unified national absolute standard. Its core lies in respecting planning, ensuring safety, and taking into account neighbors. Although the process may seem cumbersome, completing these steps in accordance with the law and regulations is the greatest guarantee for your investment, ensuring a stable and far-reaching path towards green energy, and truly enjoying the joy of "capturing wind for electricity" without worries.

prev
Wind power generation selection guide: how to choose the most suitable generator?
recommended for you
no data
GET IN TOUCH WITH Us
Naier is a company integrating R&D, production, and sales of small and medium-sized wind turbines.
Contact Us
Add:
Scientific Innovation Park on the West Bank of Taihu Lake, Zhoutie Town, Yixing City


Contact person: Chris
Tel: +86-13564689689
Copyright © 2025 Yixing Naier Wind Power Technology Co., Ltd - smartwindturbine.com | Sitemap | Privacy Policy
Customer service
detect