Yixing Naier Wind Power Technology Co., Ltd has an experienced quality control team to inspect the production process of vertical access turbine. They have full authority to implement the inspection and maintain the quality of the product in compliance with the standards, ensuring a smooth-running and efficient production process, which is absolutely integral to create the high quality product that our customers expect.
As a top brand in the industry, Naier plays a crucial role in our company. In the Word-of-Mouth research carried out by the industry association, it attracts people because it is both environmental- and user-friendly. This is also the key reason for the year-by-year increasing sales volume and the stably high repurchase rate. All products under this brand are believed to be of premium quality and excellent performance. They are always in the lead in the market.
We agree that all-around services should be provided on a continuous base. Therefore, we strive to build a complete service system before, during and after the sales of the products through Yixing Naier Wind Power Technology Co., Ltd. Before we manufacture, we work closely to record customer information. During the process, we timely inform them of the latest progress. After the product is delivered, we proactively keep in touch with them.
Our wind turbine output is three-phase AC.
We mainly produce 100W~500KW horizontal axis wind turbines.
Homemade wind turbine is an innovative project with environmental significance and practical value, but it needs to comply with certain procedures and regulations when carrying out related construction and use. The following is an introduction to the procedures required for homemade wind turbines for your reference.
Procedures before project approval:
1.planning permission: When choosing the installation location of homemade wind turbines, you need to understand the local planning permission. Different districts will have different planning management policies and may need to submit a planning application to the relevant authorities for approval.
2.land procedures: if the homemade wind turbine needs to occupy land or buildings, you need to go through the corresponding land procedures. This may include land use rights applications, planning permits for building land, etc.
3. Environmental impact assessment: In some areas, the installation of homemade wind turbines may require an environmental impact assessment to assess their potential impact on the surrounding environment. This requires the commission of a professional body to carry out an assessment and perform the relevant procedures in accordance with the assessment results.
4, construction project planning permission: for the specific construction projects of homemade wind turbines, it may be necessary to submit an application for project planning permission to the local construction administrative department to ensure that it meets the relevant building codes and safety standards.
Procedures for the construction phase:
1, construction permit: Before starting the construction of homemade wind turbines, it may be necessary to submit an application for construction permit to the relevant departments and approve it in accordance with relevant regulations.
2, safety production permit: the construction and operation of homemade wind turbines involve safety production issues, so it may be necessary to apply to the relevant departments for safety production permit to ensure its safe and reliable operation.
Procedures at the use stage:
1. grid-connected approval: if the power generation of homemade wind turbines exceeds a certain scale and needs to be connected to the grid for grid-connected power generation, it is necessary to apply to the power management department for grid-connected approval to meet the relevant technical requirements and standards.
2.power generation license: For the electricity generated by homemade wind turbines, it may be necessary to apply for a power generation license to the energy management department to legally produce and sell electricity.
3.operation and maintenance records: the operation and maintenance of homemade wind turbines need to be recorded, including equipment information, operation and maintenance plans, safety measures, etc., to ensure the safe and stable operation of equipment.
Other relevant procedures:
1. tax registration: involving the income and tax issues generated by self-made wind turbines, tax registration may be required to fulfill the relevant tax declaration obligations.
2. regulatory filing: according to the relevant local regulations, it may be necessary to carry out the regulatory filing of homemade wind turbines, so that the regulatory authorities can manage and supervise them.
It should be noted that the specific regulations and requirements may vary in different regions, and the above is only a general introduction. Therefore, when carrying out homemade wind turbine projects, professionals should be consulted in light of the actual local situation to ensure that all relevant procedures are handled and relevant activities are carried out legally and in compliance.
With the improvement of people's awareness of environmental protection and the wide application of renewable energy, we believe that many friends have seen wind turbines during their travels. Now let's take a look at the advantages and disadvantages of vertical axis wind turbines.
First, advantages of vertical axis wind turbines as below:
A, Strong wind resistance. The principle of horizontal rotation and triangular double pivot design makes it less susceptible to wind pressure and can withstand typhoons of 45 meters per second.
B, No auxiliary systems need to be installed. Compared to horizontal axis fans, vertical axis fans have blades that rotate parallel to the ground, allowing wind energy to be obtained from various directions. There is no need to add yaw devices to adjust the direction of wind energy reception like horizontal axis fans. The overall structure has become simpler, reducing the vibration generated by fan operation to a certain extent and improving its reliability.
Second, disadvantages of vertical axis wind turbines as below:
A, The starting performance index of the vertical axis fan is worse than that of the horizontal axis fan,
B, During the rotation of the blades, negative torque is generated at some positions, resulting in low output efficiency of the fan;
C, Common issues for all wind turbines: vibration resistance, especially for large wind turbines;
Naier Wind Power specializes in 100W-500kW small and medium-sized wind turbines, mainly including vertical axis wind turbines, horizontal axis wind turbines, street light wind turbines, wind solar complementary street light systems, new energy field monitoring systems, decentralized household power supply systems, scenic area lighting systems, and other one-stop services. The products are exported to multiple countries and regions such as the United States, Germany, France, Canada, Norway, Australia, and are deeply loved and praised by customers. If you want to know more about vertical axis wind turbines, please kindly contact us or leave message for more informations.
The correct use of wind turbines is crucial for their normal operation and reliability. The following are the precautions to be taken when using wind turbines:
1. If the motor is found to be working abnormally, shaking or making abnormal sounds, it should be stopped for inspection.
2. When the fan rotates at high speed, do not stand or perform other work on the direction of the rotation plane of the wind turbine to prevent the blades from flying out and injuring people.
3. The battery should be kept dry and clean, and metal objects should not be placed on the battery pack to prevent short circuits.
4. Do not place the negative grounding of the electrical box and the single matched reverse order together to avoid short circuits. Use the reverse power supply according to the reverse power supply manual.
5. The tightener of the stay wire will automatically loosen when encountering strong winds. After adjustment, it can be locked with iron wire. After each strong wind, check if the stay wire is loose and promptly eliminate any looseness. (Upright pole must be vertical)
6. Wind turbines should be wired separately and not mixed with other lines. It is recommended to use DC power for lighting, and AC power output from inverters can be used for household appliances. (The inverter and inverter output lines cannot be connected in parallel, and the inverter output line cannot be connected to the mains.)
7.When wiring the electrical box, first connect the battery and then connect the output line of the generator. When disassembling, first disassemble the output line of the generator and then disconnect the wiring of the battery pack
8.The shutdown switch of the electrical box is usually in the starting position, and is used for temporary shutdown when the battery is fully charged or in defense against severe storms. Only the wind wheel is slowly running and unplugged to the shutdown position, and the switch is not allowed to be unplugged when rotating at high speed.
Overall, the proper use of wind turbines is essential to ensure equipment safety, improve performance and extend service life. This is also a key measure to ensure the reliable operation and efficient generation of wind power systems.